top of page
Blue Shield Environmental logo

Asbestos Testing and Inspections in Georgia, Tennessee, and Alabama

Licensed in Georgia, Tennessee, and Alabama. Call 770-670-4247.

An asbestos test tells you whether a material in your building contains asbestos before anyone sands, cuts, or tears it out. Blue Shield Environmental sends an accredited asbestos inspector to collect bulk samples of the materials that will be disturbed, such as drywall joint compound, popcorn ceiling texture, flooring and mastic, pipe insulation, and roofing. Samples go to an accredited laboratory for polarized light microscopy, and results are typically back within 24 to 48 hours. Under the EPA asbestos NESHAP, 40 CFR Part 61 Subpart M, the owner or operator of a commercial renovation or demolition must have the affected area thoroughly inspected for asbestos before work starts, and Georgia EPD enforces those rules under Chapter 391-3-14. Homeowners are not always required to test, but insurance adjusters, contractors, and lenders often ask for results before a water loss, remodel, or sale can move forward. If a material is positive, you get a written report that shows where it is, how much there is, and what it would take to remove it.

What we sample

We sample only what your project will disturb. A kitchen remodel might need flooring, mastic, and drywall samples. A water loss might need ceiling texture and wall material from the affected rooms. A full building survey for demolition covers every suspect material. Each sample is labeled, logged on a chain of custody form, and sent to an accredited lab.

How fast you get results

Standard turnaround is 24 to 48 hours from the time the lab receives the samples. You receive the lab report and a plain language summary that tells you which materials are positive and what that means for your project.

Which rules apply

  • EPA NESHAP, 40 CFR Part 61 Subpart M: requires an asbestos inspection before commercial renovation or demolition.

  • AHERA, 40 CFR Part 763: sets inspection and management plan rules for K through 12 schools.

  • OSHA 29 CFR 1926.1101: requires building owners and employers to identify asbestos before construction work exposes workers.

  • Georgia EPD Chapter 391-3-14, Tennessee TDEC, and Alabama ADEM license and enforce asbestos work in each state.

If your results are positive

A positive result does not always mean removal. Material in good condition that will not be disturbed can often stay in place. If it will be disturbed, we can quote removal the same week. See residential asbestos abatement and commercial and industrial abatement. For lead questions in homes built before 1978, see lead paint testing and RRP renovation.

Frequently asked questions

How long do asbestos test results take?

Most results are back within 24 to 48 hours of the lab receiving the samples.

Do I need an asbestos test before a remodel?

For commercial renovation and demolition, the EPA NESHAP rule requires an inspection first. For a single family home it is often not legally required, but contractors and insurance adjusters frequently ask for results before work starts.

Can I collect my own asbestos sample?

We do not recommend it. Disturbing a suspect material without containment can release fibers, and a sample collected by an accredited inspector carries more weight with adjusters and regulators.

Which materials are most likely to contain asbestos?

In buildings built before the 1980s, common suspects include popcorn ceiling texture, drywall joint compound, vinyl floor tile and black mastic, pipe and boiler insulation, and some roofing and siding.

Do you test for lead paint too?

Yes. We can collect lead paint samples during the same visit. Our Georgia and Alabama Lead RRP firm certifications cover renovation work in homes built before 1978.

This page explains how federal and state rules generally apply. It is not legal advice. Confirm project specific requirements with the agency named or with our team.

Talk to a licensed asbestos contractor today. Call 770-670-4247 to talk with our team.

bottom of page