When an inspection report flags a possible asbestos material in a home for sale, buyers and sellers need a clear answer fast. Blue Shield Environmental sends an accredited inspector to sample only the suspect materials, such as popcorn ceiling texture, flooring, duct wrap, or pipe insulation, and lab results are typically back within 24 to 48 hours. You get a written report that says whether each material is positive or negative. If a material is positive, we can quote removal so the parties can negotiate with real numbers. For homes built before 1978, renovation that disturbs paint above the EPA Renovation, Repair, and Painting Rule thresholds in 40 CFR Part 745 must be done by a certified renovation firm, and we hold Lead RRP firm certifications in Georgia and Alabama. We give plain answers and do not use scare tactics.
How we help a transaction
Sampling of the flagged materials
Lab results typically within 24 to 48 hours
A written quote if removal is needed
Related pages
Asbestos testing and lead paint testing and RRP renovation.
Frequently asked questions
Does a home need to be tested before it is sold?
Not usually. Testing is typically done when an inspector flags a suspect material or a buyer plans renovation.
How fast can you get results?
Lab results are typically back within 24 to 48 hours of the lab receiving the samples.
Can you quote removal for negotiations?
Yes. If a material is positive we provide a written quote.
This page explains how federal and state rules generally apply. It is not legal advice. Confirm project specific requirements with the agency named or with our team.
Talk to a licensed asbestos contractor today. Call 770-670-4247 to talk with our team.
